- Other Mining Machinery[10]
- Other Ore[2]
- Mineral Separator[10]
- Mining Feeder[10]
- Crusher[10]
- Vibrating Screen[5]
- Conveyors[3]
- Mine Mill[10]
- Used Mining Machinery[3]
- Separation Equipment[1]
- Contact Person : Ms. Men Lena
- Company Name : Yantai Jinpeng Mining Machinery Co., Ltd.
- Tel : 86-535-3975297
- Fax : 86-535-3975297
- Address : Shandong,Yantai,No.11 FUZHOU ROAD, DEVELOPMENT ZONE. YANTAI CITY, SHANDONG PROVINCE, CHINA
- Country/Region : China
- Zip : 264006
Mine Feasibility Research
Yantai Jinpeng Mining Machinery CO., LTD
Add:No.11, Fuzhou Road, development District, Yantai, Shandong Province
Tel: 0086-0535-3975297 Fax: 0086-0535-3975297
Following are a catlog of a research report.
Chapter 1. Pandect
1.1 Project general situation
1.2 Design basis&principle
1.3 Project construction condition
1.4 Main construction scheme
1.5 Public auxiliary facilities and civil engineering
1.6 Environmental protection and safety -hygiene
1.7 Investment and economic effect
1.8 Existing problems and suggestions
Chapter2. Market analysis
2.1 Overview
2.2 Gold production statistics
2.3 Gold price analysis
2.4 Market analysis
2.5 Market forecasting
Chapter 3. construction scheme research
3.1 Scale of development and service life
3.2 Product solution
3.3 Site plan
Chapter4. resources conditions
4.1 Overview
4.2 Sketch of regional geology
4.3 Geological and mining geological features
4.4 Deposit hydrogeological and mining technical conditions
4.5 Mine geology exploration work and its evaluation
4.6 Geological resources and reserves estimation
4.7 Infrastructure, production prospecting
4.8 Existing problems and suggestions
Chapter 5. Ore mining
5.1 Mining areas
5.2 Mining technology conditions
5.3 Ore mining
5.4 Mine scale,work system and production capacity test&verify
5.5 Pioneering transportation system
5.6 Ventilation system
5.7 Mine filling
5.8 Underground watersupply, drainage and waterproof
5.9 Blasting equipment warehouse
5.9 Infrastructure project and project construction progress5-41
5.10 Existing problems and suggestions
Chapter 6. Mining machinery
6.1 Underground transportation system
6.2 Ming slope ascension
6.3 Blind slope
6.4 Ramp lifting transportation
6.5 Compressed air facilities
6.6 Underground drainage
6.7 Underground water supply facilities
6.8 Ventilation system
6.9 Filling facilities
Chapter 7 Benefication
7.1 Overvieww
7.2 Raw ore
7.3 Benefication test
7.4 Comparation ofdesign scheme
7.5 Construction scale, service life and work system
7.6 Selection&calculation of main process equipment
7.7 Building layout and equipment configuration
7.7 Auxiliary facilities
7.8 Tailings facilities
Chapter 8. Assembly drawing transportation
8.1 Overview
8.2 Main facilities composition and the general arrangement
8.3 Enterprise cover area
8.4 Enterprise transportation and the factory road
Chapter 9. Civil and public aided engineering
9.1 Civil engineering
9.2 Watersupply and drainage
9.3 Electric power, telecom , instruments and automatic control
Chapter 10. soil and water conservation
10.1 Construction project and the surrounding environment situation
10.2Construction project control responsibilities scope
10.3 Discharge waste stone soil, waste of soil and water loss and cause&harm
10.4 Water&soil loss prevention plan
10.5 Restore vegetation work schedule
10.6 Guarantee of soil and water conservation measures
Chapter 11. Energy saving
11.1 Design basis&principle
11.2 Design of energy saving measures
11.3 Energy consumption indicators and analysis
Chapter 12. Environment protection
12.1 Overview
12.2 Main pollution sources and control measures
12.3 Estimate of environmental protection measures investment
12.4 Environmental management and monitoring
12.5 Soil-water conservation and land reclamation
12.6 Assessment of environmental impact
12.7 Suggestions
Chapter 13. Safety and hygiene
13.1 Overview
13.2 Design basis&principle
13.3 Analysis of main harm factor to production safety
13.4 Safety technical measures taken in design
13.5 Analysis of mining safety deposit reliability
13.6 Reliability of mining power supply system
13.7 Industrial hygiene
13.8 Safety and hygiene supervision and management systems and institutions set
13.9 Problems needed to explain
13.10 Special investment estimate
13.11 Construction project labor safety and hygiene beforehand assessment
Chapter 14. Organizations and fixed personnel
14.1 Set of the organization
14.2 fixed personnel
14.3 Plant schedule
11.4 Wages
14.6 Worker source and training
Chapter 15. Investment estimation
15.1 Investment estimation
15.2 Engineering survey and total investment
Chapter 16 Technical economy evaluation
16.1 Overview
16.2 Project total financing and use
16.3 Cost estimation
16.4 Production and income
16.5 Income determination
16.6 Financial profit ability analysis
16.7 Uncertainty analysis
16.8 Comprehensive economic effect assessment
Mine Feasibility Research